Wyndham Grand Batumi Gonio. Aqua

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua

Wyndham Grand Batumi Gonio. Aqua

1. Installation of utilities systems.
— Wiring, the 3rd, 16th, 19th floors.
— Installation of water piping, the 17th floor.
— Installation of exhaust ventilation system risers, the 8th- 9th floors.

2. Facade works.
— Facade winterization, on the balconies of the 3rd, 5th floors.

3. Suspended ceiling installation.
On the balconies, the 6th floor.

4. Insulation.
On the 8th -15th floors.

Due to weather conditions, no other construction work is underway at the site.