Wyndham Grand Batumi Gonio. Aqua
1. Installation of utilities systems.
— Wiring, the 3rd, 16th, 19th floors.
— Installation of water piping, the 17th floor.
— Installation of exhaust ventilation system risers, the 8th- 9th floors.
2. Facade works.
— Facade winterization, on the balconies of the 3rd, 5th floors.
3. Suspended ceiling installation.
On the balconies, the 6th floor.
4. Insulation.
On the 8th -15th floors.
Due to weather conditions, no other construction work is underway at the site.