Wyndham Grand Batumi Gonio. Aqua
1. Installation of utilities systems.
— Wiring, the 3rd, 16th, 19th floors.
— Installation of water piping, the 17th floor.
— Installation of exhaust ventilation system risers, the 8th- 9th floors.
2. Facade works.
— Facade winterization, on the balconies of the 3rd, 5th floors.
3. Suspended ceiling installation.
On the balconies, the 6th floor.
Due to weather conditions, no other construction work is underway at the site.