Wyndham Grand Batumi Gonio. Aqua

1. Installation of utilities systems.
— Wiring, the 3rd, 16th, 19th floors.
— Installation of water supply system, the 6th -9th floors.

2. Facade works.
The facade winterization on the balconies, the 3rd, 11th, 13th floors.

3. Installation of drywall framing, the 11th — 12th floors.
Installation of frame guides for drywall partitions.

4. Installation of the elevator shafts.
Installation of reinforced concrete beams in elevator shafts.

5. Insulation.
On the balconies, the 8th-9th, 13th, 15th floors.

6. Fabrication and installation of the steel arches.
On the 19th floor.

7. Floor screeding.
On the balconies and in the units, the 20th floor.