Wyndham Grand Batumi Gonio. Aqua

Wyndham Grand Batumi Gonio. Aqua

Wyndham Grand Batumi Gonio. Aqua

Installation of Engineering Systems
Electrical installation work, 3rd, 20th floors.
Installation of the water supply system, 3rd-9th floors.

2. Facade Works
Thermal insulation of balconies, 3rd, 5th, 12th floors.

3. Installation of Drywall Frame
Installation of guiding frames for drywall partitions, 17th-19th floors.
Sheathing of the frame, 4th-6th floors.

4. Installation of Suspended Ceilings
On the 2nd-7th floors.

5. Arch Sheathing
On the 9th, 19th-20th floors.

6. Workshop Works
Manufacturing of embedded parts.

7. Roof Works
Installation of stands.

8. Infrastructure Building
Reinforcement of the floor slab.