Wyndham Grand Batumi Gonio. Aqua
Installation of Engineering Systems
Electrical installation work, 3rd, 20th floors.
Installation of the water supply system, 3rd-9th floors.
2. Facade Works
Thermal insulation of balconies, 3rd, 5th, 12th floors.
3. Installation of Drywall Frame
Installation of guiding frames for drywall partitions, 17th-19th floors.
Sheathing of the frame, 4th-6th floors.
4. Installation of Suspended Ceilings
On the 2nd-7th floors.
5. Arch Sheathing
On the 9th, 19th-20th floors.
6. Workshop Works
Manufacturing of embedded parts.
7. Roof Works
Installation of stands.
8. Infrastructure Building
Reinforcement of the floor slab.