Get a Consultation

← All news

Wyndham Grand Batumi Gonio.

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio.

Wyndham Grand Batumi Gonio. Aqua — Preparation of stained glass windows waterproofing/vapour barrier continues at the site. Installation of decorative boxes on balconies, dusting of ceilings, geodetic works, anti-corrosion works (metal painting), lifting of construction materials to the floors, installation of lift shaft coverings (preparation for installation of lift equipment), diamond drilling of engineering holes, plastering of openings and installation of plasterboard frame of internal partitions, lifting of materials to the floors, unloading of materials.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news