Wyndham Grand Batumi Gonio. Family Club.

Block A
1. Facade arrangement.
Works on facade insulation and partition walls on balconies.

2. Plastering works, 2nd, 5th floor.
Plastering of internal walls.

3. Arrangement of the framework of ceilings on the balconies.
On the 4th floor.

4. Making metal boxes on balconies and terraces.

Block B
1. Plastering works.
Plastering of internal walls, 3rd floor.

2. Masonry works.
Ceramoblock masonry, 5th floor. 3.

3. Installation of engineering systems.
Arrangement of storm water drainage risers.