Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Facade arrangement.
— Works on facade insulation and partition walls on balconies.
— Plastering of the facade.
2. Installation of monolithic belt on the roof parapet. 3.
3. Plastering works.
Plastering of the internal walls, 2, 5 floors.
4. Plasterboard frame installation works.
Arrangement of guide frames of GKL partitions.
5. Installation of hangers for ceilings on balconies.
Block B
1. Plastering works.
Plastering of internal walls, 3rd floor.