Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Facade construction.
Works on facade insulation and partition walls on balconies.
2. Installation of monolithic belt on the roof parapet.
3. Arrangement of elevator shafts, 4th floor.
Installation of reinforced concrete portals in elevator shafts.
Block B
1. diamond drilling of engineering holes.
For the device of storm water drainage.
2. Plastering works.
Plastering of internal walls, 2nd floor.
3. Masonry works, roofing.
Block masonry in ventilation shafts.