Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Facade construction.
Works on facade insulation on balconies.
2. Floor screed works.
Preparation works.
3. Arrangement of the framework of ceilings on the balconies.
On the 4th floor.
4. Installation of stained glass windows.
Installation of stained glass structures and glasses.
5. Fabrication of metal boxes on balconies and terraces.
Block B
1. Masonry works.
Ceramoblock masonry, 5th floor.
2. Plastering works, 4th floor.
Plastering of internal walls and balconies.
3. Installation of engineering systems.
Installation of storm water drainage.