fbpx

Wyndham Grand Batumi Gonio. Family Club.

Block A
1. Facade works, 3rd floor.
Insulation of the facade, installation of mineral wool.

2. Ceiling installation.
On the balconies of the 4th floor.

3. Arrangement of metal arches on balconies.
— Manufacturing and installation of arches.
— Painting of arches.

4. Waterproofing works.
Preparatory works for waterproofing on terraces.

Block B.
1. Arrangement of the reinforcement belt of ventilation shafts.

2. Arrangement of curbs for stained glass windows.
— Arrangement of the reinforcement frame of the curbs on the balconies.
— Arrangement of the formwork of the sidewalls on the balconies.