Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Facade works, 3rd floor.
Insulation of the facade, installation of mineral wool.
2. Installation of engineering systems, 4th floor.
Arrangement of the frame of storm water drainage boxes.
3. Arrangement of ceilings.
On the balconies of the 4th floor.
4. Arrangement of metal arches on the balconies.
Painting of arches.
Block B.
1. Arrangement of the reinforcement belt of ventilation shafts.
2. Arrangement of curbs for stained glass windows.
— Arrangement of the reinforcement frame of the curbs on the balconies.
— Arrangement of the formwork of the sidewalls on the balconies.