Get a Consultation
Русский
Georgian
עברית

← All news

Wyndham Grand Batumi Gonio. Family Club.

ProjectsPublished 1 min read
Share:Link copied
Wyndham Grand Batumi Gonio. Family Club.

Wyndham Grand Batumi Gonio. Family Club.

Block A

1. Finishing works.

Laying porcelain stoneware on balconies.

2. Facade works.

— Facing the facade and slopes with clinker tiles.

— Installation of a reinforcing layer on the facade outside the balconies.

3. Workshop work.

Manufacturing of stairs and preparation of material for the radius arches of balconies.

4. Waterproofing work.

— Waterproofing of the roof.

— Installation of the second layer of coating waterproofing on balconies, 3rd floor.

Block B

1. Installation of ceilings.

Installation of ceiling frames.

2. Drilling of engineering holes.

For subsequent installation of engineering systems.

3. Facade work.

Plastering of the facade.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news