Wyndham Grand Batumi Gonio. Family Club.

Block A

1. Finishing works.

Laying porcelain stoneware on balconies.

2. Plastering works.

Plastering walls.

3. Facade work.

— Plastering the facade.

— Insulating the facade, installing a reinforcement layer over mineral wool.

4. Installing lift shafts.

Laying blocks in lift portals.

5. Workshop work.

Manufacturing stairs.

Block B

1. Installation of ceilings.

Installation of ceiling frames.

2. Drilling of engineering holes.

For the subsequent installation of engineering systems.

3. Facade work.

Insulation of the facade, installation of mineral wool.