Wyndham Grand Batumi Gonio. Family Club.

Block A

1. Finishing works.

Laying porcelain stoneware on balconies.

2. Waterproofing works.

Installation of coating waterproofing on balconies.

3. Plastering work.

Application of decorative plaster on balconies.

Block B

1. Plastering work.

Plastering of walls on the 3rd floor.

2. Installation of elevator shafts.

Laying of elevator portal blocks.