fbpx

Wyndham Grand Batumi Gonio. Family Club.

Block A.
1. Glazing and installation of stained glass windows.

2. Installation of drywall framing.
Installation of frame guides for drywall partitions.

Block B.
1. Masonry works.
Installation of ceramic blocks.

2. Installation of the ledges for stained glass windows.
On the 3rd floor.