fbpx

Wyndham Grand Batumi Gonio. Family Club.

Block A
1. Installation of engineering systems, 2nd floor.
Flashing of storm sewer ducts.

2. Ceiling installation.
Arrangement of ceiling framework.

3. Plastering works, 2nd floor.
Plastering of internal walls.

4. Manufacturing of metal arches on balconies.