fbpx

Wyndham Grand Batumi Gonio. Family Club.

Block A
1. Installation of engineering systems, 2nd floor.
Installation of storm water drainage box frame.

2. Installation of stained glass structures.
Installation of stained glass windows and glass.
3. Facade works.
Insulation of the facade.

4. Plastering works, 2nd floor.
Plastering of internal walls.

Block B
1. Work on the roof of the building.