Wyndham Grand Batumi Gonio. Family Club.

Block A
1. Installation of stained glass windows.
Installation of stained glass structures and glass.

2. Arrangement of suspended ceilings, 1 floor.
Arrangement of ceiling framework on balconies.

3. Floor screed works.
On the balconies, 3rd floor.

Block B
1. Plastering works.
Plastering of walls on balconies, 4th floor.

2. drilling of engineering holes in the elevator shafts.

3. Installation of engineering systems, 2 floor.
Installation of storm water drainage.