Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Installation of stained glass windows.
Installation of stained glass structures and glass.
2. Arrangement of suspended ceilings, 1 floor.
Arrangement of ceiling framework on balconies.
3. Floor screed works.
On the balconies, 3rd floor.
Block B
1. Plastering works.
Plastering of walls on balconies, 4th floor.
2. drilling of engineering holes in the elevator shafts.
3. Installation of engineering systems, 2 floor.
Installation of storm water drainage.