Wyndham Grand Batumi Gonio. Family Club.

Block A.
1. Installation of the ledges for stained glass window installation.
Installation of reinforced ledges on the balconies, the 1st floor.

2. Installation of elevator shafts.
Installation of decks in lift shafts.

3. Installation of drywall framing.
Installation of frame guides for drywall partitions.

4. Installation of stained glass windows.
Glazing and installation of stained glass windows.

5. Diamond drilling of the engineering openings.
It is necessary for the installation of engineering systems of the future hotel.

Block B.
1. Masonry works, the 5th floor.
Installation of ceramic blocks.