Wyndham Grand Batumi Gonio. Family Club.
Block A.
1. Plastering.
Plastering of the walls inside, the 3rd floor.
2. Installation of the ledges for stained glass window installation.
On the balconies, the 1st floor.
3. Installation of drywall framing.
Installation of frame guides for drywall partitions.
4. Elevator shafts works.
— Decking of the elevator shafts.
— Installation of ceramic blocks in the elevator shafts.