Wyndham Grand Batumi Gonio. Family Club.
Block A.
1. Plastering.
Plastering of the walls inside, the 3rd floor.
2. Installation of the ledges for stained glass windows.
Formwork removal from the ledges.
3. Installation of the stained glass windows.
Glazing and stained glass window installation.
4. Elevator shafts works.
— Decking of the elevator shafts.
5. Installation of engineering systems.
Installation of storm sewer ducts.