Wyndham Grand Batumi Gonio. Family Club.
Block A.
1. Plastering.
Plastering of the walls inside, the 3rd floor.
2. Installation of the stained glass windows.
Glazing and stained glass window installation.
3. Installation of drywall framing.
Installation of frame guides for drywall partitions.
4. Elevator shafts works.
— Decking of the elevator shafts.
5. Masonry works.
Installation of partitions on the 2nd, 3rd floors.
Block B.
1. Installation of engineering systems.
Installation of storm sewer ducts.