Wyndham Grand Batumi Gonio. Family Club.

Block A.
1. Plastering.
Plastering of the walls inside, the 3rd floor.

2. Masonry work.
Installation of partitions on the 2nd, 3rd floors.

3. Elevator Shafts.
— Decking of elevator shafts.
— Preparation for the construction of reinforced concrete portals in elevator shafts, Block A.

4. Installation of drywall framing.
— Installation of frame guides for drywall partitions, the door openings to be installed.

5. Installation of the ledges for stained glass windows.
Formwork removal from the ledges.

Block B.
1. Diamond drilling of engineering openings.
For storm water drainage system.