Wyndham Grand Batumi Gonio. Family Club.

Block A
1. Plastering work.
— Applying decorative plaster to balcony walls and slopes.
— Plastering interior walls, 2nd floor.

2. Masonry work.
Laying ceramic block staircase piers.

3. Facade work.
Grouting clinker tile joints on the facade.

4. Installation of stained glass windows.
Installation of stained glass structures and glazing.