1. Plastering work.
Plastering of interior walls, 2nd floor.
2. Facade work.
Plastering of the facade.
3. Masonry work.
Laying ceramic blocks on staircases.
Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Plastering work.
Plastering of interior walls, 2nd floor.
2. Facade work.
Plastering of the facade.
3. Masonry work.
Laying ceramic blocks on staircases.