Wyndham Grand Batumi Gonio. Family Club.

Block A

1. Plastering work.

Plastering of slopes, 1st and 2nd floors.

2. Reinforcement installation.

— Installation of reinforcement on balcony ceilings.

— Installation of reinforcement on radius arches.

— Installation of reinforcement on plaster on the building facade.

2. Waterproofing work.

Preparation of terraces for waterproofing.

Block B

1. Installation of monolithic curbs.

For subsequent installation of stained glass structures.

2. Roof work.

Installation of reinforcement belts for the roof parapet and ventilation shaft.