Wyndham Grand Batumi Gonio. Family Club.

Block A
1. Plastering work.
Plastering of slopes, 1st floor.

2. Facade work.
— Facade and slope cladding with clinker tiles.
— Plastering the facade.
— Insulating the facade.

3. Installation of plasterboard frame.
Covering the ceiling frame.

Block B.
1. Masonry work, 5th floor.
Laying ceramic blocks.