Wyndham Grand Batumi Gonio. Family Club.

Block A
1. Plastering work.
Plastering of slopes, 2nd floor.

2. Facade work.
— Facade and slope cladding with clinker tiles.
— Plastering of the facade.
— Facade insulation.

3. Installation of plasterboard frame.
Covering of ceiling frame.

4. Waterproofing work.
Preparatory work for waterproofing terraces.

Block B.
1. Masonry work, 5th floor.
Laying ceramic blocks.