Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Plastering work.
— Plastering of slopes, 2nd floor.
— Plastering of walls, 2nd floor.
2. Installation of plasterboard frame, 4th floor.
Ceiling frame covering.
3. Installation of stained glass structures.
Installation of double-glazed windows.
4. Installation of metal arches on balconies, 4th floor.
Arch covering.
Block B.
1. Installation of monolithic sides.
For the installation of stained glass structures.