Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Plastering works, 2 floors.
Plastering of internal walls.
2. Installation of engineering systems.
Installation of storm water drainage system, covering of storm water drainage system boxes.
3. Facade works.
Facade insulation, mineral wool reinforcement layer.
4. Ceiling works on balconies.