Wyndham Grand Batumi Gonio. Family Club
Block A
1. Plastering Works
Plastering of interior walls, 2nd, 3rd floors.
2. Masonry Works
Partition masonry on the 4th floor.
Masonry of ceramic block on the roof.
3. Waterproofing Works
Preparation for waterproofing balconies, application of coating waterproofing.
4. Manufacturing of Reinforcement Frames for Parapet Lintel on the Roof.
5. Installation of Drywall Frame
Installation of guiding frames for drywall partitions.
Block B
1. Diamond Drilling of Engineering Openings
For stormwater drainage system installation.