Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Family Club.

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Family Club.

Wyndham Grand Batumi Gonio. Family Club. — Building A 1. Diamond drilling for engineering openings, the 1st floor. The layout and drilling are underway, it is necessary for future hotel utility installations. 2. Installation of drywall profiles, 2nd floor. To create a strong and stable base that forms the walls. 3. Facade works. 4. Laying of ceramic blocks, 4th and 5th floors. Laying ceramic blocks in accordance with the technology, and ensuring the flatness and verticality of the walls. Checking all joints and angels for compliance with design specifications. Building B. 1. Laying of ceramic blocks, the 3rd floor. Laying ceramic blocks in accordance with the technology. The earthworks for site landscaping are in progress.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news