Wyndham Grand Batumi Gonio. Family Club.
Building A
1. Facade works.
Plastering of outer walls.
2. Installation of drywall framing, on the 5th floor.
Installation of guide frames for drywall partitions, drywall frame installation.
3. Concrete pouring of the reinforced belt on the roof parapet.
Building B.
1. Masonry works, the 5th floor.
Ceramic block installation.
2. Construction of ledges for stained glass installation.