Wyndham Grand Batumi Gonio. Family Club.

Building A
1. Facade works, the 3rd floor.
Plastering of inner walls.

2. Installation of drywall framing, on the 1st floor.
Installation of guide frames for drywall partitions, drywall frame installation.

3. Construction of opening jambs.

Building B.
1. Installation of ledges for the stained glass windows.
On the 2nd floor.

Due to weather conditions, no other construction work is underway at the site.