Wyndham Grand Batumi Gonio. Family Club.
Building A
1. Installation of
— The formwork installation for the balcony ledges on the 3rd, 5th floors.
— Concreting the ledges on the balconies, the 3rd, 5th floors.
— Installation of reinforced frame for the balcony ledges, the 5th floor.
2. Plastering on the 3rd, 4th floors.
Plastering of inner walls.
3. Installation of drywall frames, the 5th floor.
Installation of guides for drywall partition frames.
4. Roofing.
Installation of leveling screed on the roof.
5. Plumbing.
Installation of drainage system on the balconies.
Building B.
1. Masonry works, the roof.
Ceramic block installation.
2. Installation of reinforcement frame of the bars on the parapet.