Wyndham Grand Batumi Gonio. Family Club.
Building A
1. Installation of
— The formwork installation for the balcony ledges on the 3rd, 5th floors.
— Concreting the ledges on the balconies, the 3rd, 5th floors.
— Installation of reinforced frame for the balcony ledges, the 5th floor.
2. Plastering on the 1st- 4th floors.
Plastering of inner walls.
3. Plumbing.
Installation of stormwater drainage system on the balconies.
4. Masonry works, the roof.
Ceramic block installation.