Wyndham Grand Batumi Gonio. Family Club.
Building A
1. Installation of
— The installation of the reinforced frame for the balcony ledges.
2. Plastering on the 3rd floor.
Plastering of inner walls.
Building B.
1. Masonry works, the 5th floor.
Ceramic block installation.
No other construction work is underway due to weather conditions.