Wyndham Grand Batumi Gonio. Family Club.

Building A
1. Installation of cast-in ledges on the balconies.
— The ledges are being reinforced on the balconies, the 3rd floor.
— The ledges are being formworked the 3rd floor.
— The ledges are being reinforced on the balconies, the 4th floor.
— Concreting the ledges on the balconies, the 4th floor.

2. Plastering, the 1st, 3rd, 4th floors.
Plastering of inner walls.

3. Installation of drywall frames, the 2nd, 3rd floors.
Installation of guides for drywall partition frames.

4. Roofing.
Installation of leveling screed on the roof.

5. Installation of glazing and stained glass windows.

Building B.
1. Masonry works, the roof.
Ceramic block installation.