Wyndham Grand Batumi Gonio. Family Club.

Building A
1. Installation of cast-in ledges on the balconies.
— The ledges are being reinforced on the balconies, the 3rd floor.
— The ledges are being formworked on the 3rd floor.
— The ledges are being reinforced on the balconies, the 4th floor.
— Concreting the ledges on the balconies, the 4th floor.

2. Plastering, the 1st, 3rd, 4th floors.
Plastering of inner walls.

3. Plumbing
Installation of the drainage system.

4. Installation of drywall frames, the 2nd, 3rd floors.
Installation of guides for drywall partition frames.

5. Roofing.
Installation of leveling screed on the roof.

6. Facade works.
The walls are getting ready for mineral wool installation on the balconies.

7. Installation of glazing and stained glass windows.
Total 27 units.

Building B.
1. Masonry works, the 4th floor and the roof.
Ceramic block installation.