fbpx

Wyndham Grand Batumi Gonio. Family Club.

Building A
1. Installation of the drywall framing, the 3rd floor.
Installation of guide frames for drywall partitions, and the drywall frame construction.

2. Cast-in belt pouring for roof parapet.

Building B.
1. Installation of ledges for the stained glass windows.
— Installing reinforcement cages for cast-in ledges under stained glass windows.
— Installing formwork for cast-in ledges under stained glass windows.