fbpx

Wyndham Grand Batumi Gonio. Riviera.

1. Block A. Installation of engineering systems.
— Electrical installation works.
— Installation of storm water drainage.

2. Block A. Installation of wall formwork, technical floor.

3. Block C. Installation of engineering systems.
Installation of hot and cold water supply system.

4. Block C. Installation of stained glass windows.
Installation of window slopes.