fbpx

Wyndham Grand Batumi Gonio. Riviera.

1. Block A. Installation of engineering systems.
— Electrical installation works.
— Installation of storm water drainage.
2. Block B. Plasterboard frame installation works.
Arrangement of guide frames of GKL partitions.

3. Block C. Installation of engineering systems.
Sewerage and ventilation system installation.

4. Block E. Installation of engineering systems.
Plumbing and electrical installation works.

5. Block E. Chimney installation.
Manufacturing of frames of chimney boxes.