Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Riviera.

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Riviera.

Wyndham Grand Batumi Gonio. Riviera.

1. Block A. Installation of engineering systems.
— Fabrication of boxes for storm water drainage.
— Plumbing works.
2. Block A. Formwork fabrication and casting of reinforcing belt, technical floor. 3.

3. Block B. Plasterboard frame installation works.
Arrangement of guide frames of GKL partitions.

4. Block C. Installation of engineering systems.
Sewerage and ventilation system installation.

5. Block E. Installation of engineering systems.
Plumbing and electrical installation works.

6. Block E. Chimney installation.
Fabrication of chimney box frames.

7. Infrastructure building.
Ceramoblock masonry.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news