fbpx

Wyndham Grand Batumi Gonio. Riviera.

1. Block A. Installation of engineering systems.
Installation of electrical system.

2. Block A. Installation of window sills.
Fabrication and installation of window sills.

3. Block B. Screeding, 3rd floor.
Screed pouring on terraces.

4. Block C. Installation of engineering systems.
— Installation of hot and cold water supply system.
— Arrangement of storm water drainage, fabrication of metal boxes.

5. Block E. Installation of engineering systems.
Electricity supply system installation.

6. Fabrication and installation of storm water drainage boxes.

7. Infrastructure building, 1st floor.
Ceramoblock masonry.