fbpx

Wyndham Grand Batumi Gonio. Riviera.

1. Block A. Installation of engineering systems.
— Installation of hot and cold water supply system.
— Installation of storm water drainage system.

2. Block A. Plasterboard frame installation works.
Installation of drywall frame rails, framing.

3. Block A. Fabrication and installation of brackets for exterior window sills.

4. Block B. Screeding.
Pouring of screed on terraces.

5. Infrastructure building.
Installation of spray waterproofing.

6. Fabrication and installation of storm water drainage boxes.