fbpx

Wyndham Grand Batumi Gonio. Riviera.

1. Block A. Installation of formwork and reinforcement frames of contour walls, technical floor.

2. Block A. Installation of engineering systems.
Electrical and plumbing works.
3. Block B. Plasterboard frame installation works.
Arrangement of guide frames of GKL partitions.

4. Block E. Installation of stained glass structures.
Arrangement of jambs.

5. Block E. Installation of engineering systems.
— Installation of hot and cold water supply system.
— Fabrication of metal structures for storm water drainage system.