Wyndham Grand Batumi Gonio. Riviera.

1. Block A. Masonry works.
Ceramoblock masonry on the stair parapet.

2. Block A. Dismantling of formwork.
Works on the technical floor.

3. Block A. Manufacturing and installation of window sills.

4. electrical installation works.

Other construction works are not carried out at the site due to weather conditions.