Wyndham Grand Batumi Gonio. Riviera.

1. Block A. Plastering.
Plastering of the walls inside.

2. Block A. Mockup installation.
Wiring.

3. Block A. Insulation.
Installation of the insulation on the terraces, the 1st floor.

4. Block B. Pouring the ledges on the lents between the units.

5. Block B. Facade works.
— Facade plastering.

6. Block C. Facade works.
— Facade plastering.

7. Block E. Installation of the utilities.
Plumbing — installation of sewage and air conditioning systems.

8. Block E. Facade works.
Facade winterization.

9. Block E. Installation of drywall framing.
— Installation of frame guides for drywall partitions.