Wyndham Grand Batumi Gonio. Riviera.
1. Block A. Plastering work.
Plastering columns in the basement.
2. Blocks A and C. Construction of rear courtyards for townhouses.
3. Block A. Facade work.
Plastering the facade.
4. Block E. Installation of engineering systems.
— Electrical installation work, marking, fastening clips, cable routing.
— Installation of a drainage system.
5. Infrastructure building.
Waterproofing work.