Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Riviera.

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Riviera.

Wyndham Grand Batumi Gonio. Riviera.

1. Block A. Plastering works.
Plastering of internal walls.

2. Block A. Installation of engineering systems.
Electrical and plumbing work.
3. Block B. Plasterboard frame installation works.
Arrangement of guide frames of GKL partitions.

4. Block E. Installation of stained glass structures.
Arrangement of jambs.

5. Block E. Installation of engineering systems.
Electrical installation works.

6. Block C. Installation of engineering systems.
— Installation of ventilation and sewerage systems.
— Fabrication of metal structures for storm water drainage.

7. Infrastructure building.
Dismantling of stairwell floor slab formwork.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news